In the public areas, installing our produced stairs with handrails and a 5-meter column cladding required more resources than planned. Despite this, the hotel opened as scheduled and on time.
Site survey
Furniture production
Delivery
Unloading
Furniture installation
Domestic appliances
Lighting
Description not available